Medical waste incineration system

Medical waste incineration system of 300 kg/hr shed price with dual fuel (gas as well as diesel) Form, daily 8-16 hrs Process and a Heap elevation of 15 meter.Primary burning

* A button breaker for every engine (ventilators in addition to burners).
* A regulator with electronic viewing for the temperature of combustion.
* A sheath of all the gases charred.
15.
The gas temperature as measured versus the inside wall in the second room, not in the flame zone, Won’t be as indicated in Lots 1-7;
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
2. It must have the ability to operate less than 10 hours/day
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg
19. A control box making certain the full cycle of burning. Fan:.
– Character: Calcium silicate.
* A second shot of air to ensure best oxygen net content.
4.
The minimum departure rate of the exhausts won’t be less than 10 metres/second; 1. Capability of destruction in weight: 60 Kg/h.
* A gadget of air inlet of cooling of waste gases,.
* A regulatory authority with watch for the temperature level of postcombustion.
– Refractory concrete:.
– Shield in coarse panels:
* A burner of lights that the use is limited to the ignition of waste.
* Electro-ventilator dispersing the secondary air, the principle of the air flow being carried out by valves and also adhering to the control of the automatic cycle.
12. The loudness of the combustion chamber: 1.200 L.
i. The primary combustion chamber will be accepted as the key burning zone;
11. The Interior diameter of this Smokeshaft: Ø 400 and its height: 8 m.
* The insulation of the combustion chamber have to be composed of refractory blocks, having a high web content of aluminium and insulates bricks in order to guarantee a minimum temperature on the outside sheet steel.
7. It must be able to reduce the number of wastes by 98%.
The smokeshaft shall have a minimum elevation of 4 meters over ground level;
* Carcass in solid sheet steel with assistance of link.
. Nature: 42% of Al203.
13.
The home time in the next room shall not be less than 2 secs;
* Heater of lights of waste, with fuel, common mono-bloc casting directing stirring fire, lights and also safety and security of electronic ignition, long-term air flow, electromagnetic sluice entry of regulation and also separating valve.
24. The supplier will perforn an onsite setup of this burner.
* Burner with fuel, mono-bloc dispersing leading kind with straight flame, illumination and safety and security of electronic ignition, irreversible ventilation, electro-magnetic sluice gateway of regulation and separating shutoff.
22. Refine Filtering system: Scruber to be mentionned as discretionary.
22. The supplier should provide sets of spare pieces of very first urgency and consumable of the incinerator.
6. The burner has to stay clear of the release of black smoke in addition to good dust, (Electric) during the loadings.
16. The seller has to provide necessary details for the top of this setup.
8. It must be able to hold emission in the 2nd melt with gasoline home of not less than 2 seconds.

21. The de- ashing must be carried out in all-time low of the burning chamber or the deashing ought to be Automatic or hands on batch p ashing.
– The Temperature levels of burning: Minimum will certainly be 850oC in Addition to max 1400oC
* Composition of the refractory;.

. Thickness: ≥ 75 mm.
* A timer with flexible temporization for the law of each burner.
25. The technical training of operators will need to be provided as well as provided by a professional.
Both the primary and the additional temperature levels shall be preserved till all the waste has actually been completely combusted;

Smokeshaft
23. Capability to deal with Plastic: Not less than 40 percent by weight.
9. The incineration ought to be totally devoid of noticeable smoke as well as offensive odours.
23. The set up incinerator should birth a 1 year guarantee.
* Frontage of packaging with door seals gone up on hinges, wheel of screw plug, flexible joint, and packaging protecting out of refractory.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
14. Heater procedure must be Automatic On/Off.
21. Controls and guidelines:.
– Shield in fibrous panel:.
.
Nature: 65 percent of Al203.
3. This burner has to be able to ruin all combustible wastes produced by health care facilities, private clinics, research labs, institutes, and so on.
17. A burning chamber of waste:.
* A heater of combustion of gases.
* Plate of combustion in Carborundum, preventing the repairing of glass and slags. A chamber of post combustion of gases.
* Completely limited door for the hand-operated loading of waste. The loading ought to be Guidebook, Batch Tons.
ii. The minimum burning of the main room Won’t be less than 800 degrees C;

Second combustion

21. The de- ashing must be performed in all-time low of the burning chamber or the deashing ought to be Automatic or hands-on batch de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional.
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
23. Capability to deal with Plastic: Not much less than 40% by weight.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
22. The provider should provide sets of spare parts of very first urgency and consumable of the incinerator.
23. The set up incinerator should birth a one year guarantee.
24. The provider will perforn an onsite setup of the burner.
25. The technological training of operators will have to be provided as well as provided by a professional.
from the factory; it will consist of alleviative and preventative upkeep, as well as using device, etc