Put in a diesel fired incinerator

incinerate mainly pharmaceuticals ( all types of dosage forms … syrups, tablets, injectables ) medical consummabables, and also biological fluids …

1.3FIELD TRAINING
Test the incinerator under actual firing conditions. Verify with analyzing that all controls function within the minimum and maximum limits for temperature or time. Simulate actual unsafe conditions such as high temperatures and flame failure by decreasing the settings for the activation of limit and safety controls.
Run the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random places, shall not exceed the temperature limitation of paragraph furnace structure.
Preheat the incinerator for 4 hours to reach the firing temperature of 982degrees C [1800] degrees F. Weigh and record the complete charge weight. Charge the incinerator at the rated burning capacity in kg pounds per hour for a period of [4] hours and operate in compliance with the manufacturer’s written instructions. Include in operation testing the performance of the mechanical charging facilities, the incinerator, the air pollution control equipment, the ash
– capacity: 300-400 kg/hour
The pharmaceuticals squander like Alu, PVC,PVDC etc.Installation for burning of animal waste cost, existence, repayment terms where it is possible to buy in Russia? I am looking to for capacity between 200 -400kg
– Fuel syetem: Dual fuel( both gas and oil )

•Control
Test the incinerator under actual firing conditions. Verify with testing that all controls function within the maximum and minimum limits for temperature or timing. Simulate actual unsafe conditions such as high temperatures and flame failure by reducing the settings for the activation of limit and safety controls.

•Shell Temperature
Operate the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random locations, shall not exceed the temperature limitation of paragraph furnace construction.
– capacity: 300-400 kg/hour
– Fuel syetem: Dual fuel( both oil and gas)