an incinerator for our dental clinics

2. A camera post-combustion gases :
Cold filter plugging point -10 ° C max.

DIESEL AND FOOD TANK BURNER

The fuel tank will be found annexed into the dugout roof incinerator at a bund and have the following characteristics:

• Capacity: 1,200 liters
• Made of sheet steel for easy wall installation cubeto
Point above 55C inflammation.
• gas or diesel burner (must be specified in the sequence ), monobloc horizontal flame, electronic ignition, secure, permanent ventilation, control valve and isolation valve.
• Meter and level switch

The incinerator has a intake of 16.2 liters of gas to burn waste generated operation 10 hours a week expected in two burning, so that autonomy will be 7.5 weeks. The reservoir will have an outlet and an inlet for return. Pipes for oil will drive the black steel pipe with longitudinal electric resistance welded 3/4 ” DN 20mm diameter. In the tank outlet pipe retainer debris filter, with aluminum body is put, aluminum cup and stainless steel sieve with holes 100 microns in diameter .advise about the ingestion rates, is that for both chambers, or per room?

After 10 minutes, the afterburner is temperature:

•Spinning on the toaster combustion chamber, which ensures the output of the gasification of waste. The operating time of the burner is programmable according to the type of waste, using a flexible mechanical timer from 1-60 minutes.
• air injection nozzles made of refractory steel with a flow control valve.
a. watertight door for manual loading of waste.
• A timer adjustable time delay for each burner control.
• fibrous insulation panels made of calcium silicate with a depth of 75mm.

an incinerator for our dental clinics.The incinerator must comply with ” Technical Standard NTON 05-015-02 Management and Solid Waste Disposal Hazardous co go ”, as well as meeting international standards performance standards for new stationary sources and emissions from the Environmental Protection Agency United States ( Environmental Protection Agency EPA ) Incinerators Medical and Hospital infectious waste ( HMIWI its acronym in English ) and the standards of the World Health Organization (WHO ).

According to point 8.5.1.3 of this NTON 05-015-02 incinerator must have the following:

” Incinerators equipped with a camera primary and a secondary combustion, equipped with burners capable of achieving complete combustion of waste and widespread destruction of harmful and toxic chemicals (dioxins and furans amongst others), attached to the solid waste bioinfectious.

a) primary combustion chamber, it requires a temperature of 800 ° C and one hour live to be ruined waste generated gas and ash, including dioxins can create cancer is found.

b ) In the secondary combustion chamber must reach temperatures around 1,100º C and have to be operated with a residence time of the flue gases of a minimum of two seconds. To treat gas flow and entrained particles, before being discharged into the air, should be added towers chemical washing, cyclones, filters. ”

The incinerator installed must comply with the design to ensure the destruction of all hazardous, biological, industrial waste as well as many others. Combustion ” PYROLYTIC ” allows management of the gasification of waste and avoid significant discharge of black smoke and fine powder during loading. Additionally, it allows, regular and complete combustion of the waste.

The main advantages are a controlled combustion that ensures the absence of smoke, color, smell or dust. It is also automatic, so you don’t need supervision and has a low fuel consumption.

The incinerator contains:

1. A combustion chamber :
• A controller with digital display for temperature afterburner.
• Automatic Burner ( gas or diesel must be specified in the order ) with flames diving in one piece monoblock with an electronic ignition system, permanent venting valve and isolation valve.

• combustion flooring made in carborundum, preventing binding of glass and slag.

Afterburner gases

• The afterburner is powerful sheet steel flange connection.
• The electrical panel meets current standard.
• automated start of combustion air fan.

After two hours, the end of ” combustion cycle ” automatically guarantee:

• The closing of primary air servomotor.
A. burner combustion, low power.
• thermal insulation panels made of fibrous silicates and calcium with a depth of 85 mm.
d . A smoke evacuation duct .

The incinerator meets as indicated on waste incineration.

During charging, opening the door ensures instant shutdown fan primary and secondary air. At the conclusion of the combustion cycle the fan primary / secondary air and burner continues to operate for two hours to protect the burners and to cool the oven. Following this time the program automatically turns off the setup completely.

FUEL USE

This installation shall take for operation of diesel with the following characteristics:

Density at 15 ° C (max / min ) 0.88 / 0.82 kg / l
They will not burn plastics, packaging except that the amount so small that gases need not receive any therapy, secondary combustion chamber into 1100C handles everything. .

The chimney is 350 mm inner diameter and a height of 8.13m will with hatch analysis.

Combustion chamber

• The combustion chamber is thick steel plate (3 to 10 mm ) with reinforcements, especially built.
• Obtaining the combustion cycle during which no tracking service ( duration 2 hours ) is required.

The combustion cycle ensures:
• Pressure gauge and filler cap
• Special high fever.

OPERATION

The operation thereof is as follows:

• Charging waste.
• Front loading with watertight door mounted on hinges, locking screw wheel, elastic gasket and an insulation lined.
• Fan distribution primary and secondary air, the air flow regulation is effected by way of valves and actuators on automatic cycle commands.

Control and regulation
Kinematic viscosity at 40 ° c ( min / max) 2 / 4.5 mm2 / s
• An inner lining of refractory concrete comprising 42% of H² 03 (alumina ) and 100 mm thick walls.
• Output for venting diameter 1 1/2 ”
Control Panel dustproof, painted sheet with chopped paint comprising:
• Internal filling refractory concrete with very higher alumina content ( 65% H² 03) and a thickness of 150 mm.
Weight sulfur 0.2 % max.
• A secondary air injection is scheduled and ensures ideal oxygen content.
b . An injection device air for total re- combustion of these gases.

c . An input device cooling of the combustion gases.
• A circuit breaker switch for each motor ( fans and burners).
• Color : Light + dark blue.

• Capacity: 1,200 liters
• Made of sheet steel for simple wall installation cubeto
• Output for ventilation diameter 1 ½ ”
• Pressure gauge and filler cap
• Meter and level switch

The incinerator has a consumption of 16.2 liters of diesel hour to burn waste generated operation 10 hours a week expected in two burning , so that autonomy will be 7.5 weeks . The reservoir will have an outlet and an inlet for return. Pipes for oil will drive the black steel pipe with longitudinal electric resistance welded 3/4 ” DN 20mm diameter . In the tank outlet pipe retainer debris filter , with aluminum body is placed , aluminum cup and stainless steel sieve with holes 100 microns in diameter .advise on the consumption rates, is that for both chambers, or per chamber?